Cloud Readiness Assessment and 6Rs Workload Classification

A cloud readiness assessment inventories your servers, databases and applications, maps what talks to what, and assigns each workload one of the 6Rs: rehost, replatform, refactor, repurchase, retire or retain. The output is a decision per workload, not a generic report.

Key takeaways

  • Every workload gets one of six outcomes, with a written reason, before any migration tooling is switched on.
  • Dependencies are measured from real traffic, not recalled from memory or old diagrams.
  • Retire and retain are legitimate answers and often the cheapest ones.
  • Compliance, licensing and latency constraints are captured at assessment time, when they are cheap to handle.
  • The assessment feeds directly into the migration roadmap and landing zone design.

Why the assessment decides how the migration goes

Most troubled migrations fail before the first server moves. The estate was larger than the spreadsheet said, a batch job depended on a file share nobody remembered, or a database licence did not allow the target platform. Each of these is cheap to find during assessment and expensive to find during cutover.

A readiness assessment is the first stage of our cloud migration service. It produces the evidence that the migration roadmap is built on, and it shapes the design of the landing zone. Skipping it does not save time. It moves the discovery work to the most stressful part of the project.

What a good assessment contains

  • A reconciled inventory: servers, databases, storage, network devices, SaaS in use and the owner of each.
  • Dependency groups: sets of systems that must move together because they talk constantly.
  • A per-workload record of constraints: compliance scope, data residency, licensing, latency, support status.
  • A 6Rs classification with a written reason and a named risk.
  • A list of unknowns, each with an owner and a date to resolve it.

If an assessment cannot tell you why a workload is classed as replatform rather than rehost, it is not finished.

The 6Rs in practice

StrategyWhat it meansTypical fit
RehostMove the VM as it isStable commercial software, tight deadlines, data centre exit
ReplatformMove with a small change, for example to a managed databaseDatabases, message brokers, simple web tiers
RefactorRedesign for cloud native servicesSystems with real scaling or release pain
RepurchaseReplace with SaaSEmail, CRM, ticketing, internal tools
RetireSwitch offUnused or duplicated systems
RetainLeave where it is for nowSite-tied hardware, licence limits, imminent retirement

Rehost is often the right first move even when refactor is the long-term goal. Moving first and modernising later separates two risky changes. The mistake is treating rehost as an end state without checking the running cost, which is why the cost optimisation stage is part of the programme.

How the dependency mapping works

Documentation of dependencies is usually wrong in one of two ways: it is out of date, or it covers application calls but not the quiet ones such as DNS lookups, NTP, LDAP binds, backup agents and monitoring. We read dependencies from traffic.

For a VMware estate, that can mean enabling flow collection for a few weeks and aggregating it. On the source side, a quick view of established connections on a candidate server is often enough to start a conversation:

# Established connections grouped by remote address and port
ss -tn state established '( sport = :443 or dport = :1433 or dport = :5432 )' \
  | awk 'NR>1 {print $4}' | sort | uniq -c | sort -rn | head -20

This is a starting point only. Monthly and quarterly jobs will not appear in a two week sample, so we ask owners about batch schedules and extend the capture window across a month end where finance systems are involved.

Decisions and trade-offs

Agent-based or agentless discovery

Agentless discovery through the hypervisor is quick and light, and gives sizing and inventory. It cannot see inside the guest well enough for dependencies. Agent-based discovery sees processes and connections but needs change approval on each server. We usually start agentless, then add agents to the application groups where dependency questions remain.

Sizing from utilisation, not from the existing VM

On-premises servers are often oversized because hardware was bought for peak plus growth. Sizing the cloud instance from observed CPU, memory and disk behaviour avoids paying for headroom you never used. Collect enough history to include the busy periods, and keep a margin for unusual events.

Where not to over-invest

Not every workload needs the same depth of analysis. A small internal tool that is being retired does not need a month of dependency capture. We spend effort where the risk is: customer-facing systems, databases, anything with compliance scope.

Common failure modes

  • A spreadsheet treated as truth. We reconcile it against discovery output and flag differences rather than trusting either source alone.
  • Compliance found late. We record data classification and regulatory scope at the start, so region choice and encryption design are known before the security baseline is written.
  • Licensing surprises. Some database and middleware licences are tied to sockets, cores or specific hosting terms. We list them and ask the vendor or your licensing contact before assuming portability.
  • Everything marked refactor. Ambition is good, but a programme where every workload needs redesign never finishes. We push back and sequence modernisation after the move.
  • Orphaned workloads. Systems with no owner are a risk either way. We name an owner or recommend retirement.

Delivery and handover

You receive the work as documents and data you can keep: the inventory in a spreadsheet or a repository, dependency groups, the classification table and a short written summary of the main risks. Where it helps, we encode the target environment decisions as infrastructure as code later in the programme, but the assessment itself needs no tooling to stay in your account.

We run a review session with application and business owners before closing. This is the point where disagreements are cheapest to settle, and it is where we most often change a classification.

How to tell it is working

A useful assessment shows up in the next stage. Every workload has an owner and a strategy. Dependency groups are small enough to plan waves around. Nobody is surprised during rehearsal by a system that was not in the inventory. The list of open unknowns shrinks each week.

If you want an honest read on what your estate would involve, book a consultation and we will scope an assessment with you. For the wider picture of how we run programmes, see engagement models.

References

How we deliver it

  1. 01

    Collect the inventory

    We combine discovery tooling, hypervisor exports and a CMDB if you have one, then reconcile them against what people say is running.

  2. 02

    Measure dependencies

    Network flow data and process listings show which systems talk to which, including the surprises nobody documented.

  3. 03

    Capture constraints

    Licensing, data residency, compliance scope, latency limits, end of support dates and business owners are recorded per workload.

  4. 04

    Classify with the 6Rs

    Each workload is assigned a strategy using agreed criteria, with the reasoning and the main risk written down.

  5. 05

    Review with owners

    Business and engineering owners challenge the classification so disagreements surface before planning begins.

  6. 06

    Hand over the decision pack

    You receive the inventory, dependency groups, classification and open questions, ready to drive the roadmap.

Tools and technologies

AWS Application Discovery ServiceAWS Migration EvaluatorAzure MigrateVMware vCenter exportsVPC Flow LogsNSG flow logsWiresharkTerraformCloudHealthMicrosoft Assessment and Planning Toolkit

Frequently asked questions

What is a cloud readiness assessment?
It is a structured review of your current estate that decides whether, how and in what order each workload should move to the cloud. It covers the inventory, dependencies, constraints, risks and a migration strategy per workload. A good one ends with decisions you can act on, not a slide deck of observations.
What are the 6Rs of cloud migration?
The 6Rs are rehost (lift and shift), replatform (small changes such as a managed database), refactor (redesign for cloud native), repurchase (move to SaaS), retire (switch off) and retain (leave where it is). Each workload gets exactly one, chosen against cost, risk, effort and business value.
How long does an assessment take?
It depends on estate size and how good your records are. A small environment can be assessed in a couple of weeks. Larger estates take longer mainly because of dependency discovery and waiting on application owners. We agree the scope and a timeline in the first call.
Do we need discovery agents on every server?
Not always. Agentless discovery through the hypervisor gives inventory and sizing. Agent-based or flow-based discovery is needed when you want accurate dependencies. We choose per environment, and we ask security teams early because agents need approval.
When should we not migrate a workload?
Retain it if it has hardware tied to the site, strict latency to on-premises equipment, a licence that forbids cloud use, or a near-term retirement date. Moving something just to hit a target usually costs more than it saves.

Talk to an engineer about cloud readiness assessment

Book a free 30-minute call. We review your current setup and tell you honestly whether and how we can help.

Written by Saddique Khan, DevOps / SRE / Cloud Consultant Engineer. Last updated 2026-10-08.