Database Migration to the Cloud with DMS and Minimal Downtime

We migrate databases with AWS Database Migration Service or Azure Database Migration Service: a full load, then continuous replication of changes, then validation and a short cutover once the target is in sync. Schema conversion is handled separately for engine changes.

Key takeaways

  • Same-engine and cross-engine migrations are different projects, and the second needs schema and code conversion.
  • Continuous replication keeps downtime to the final switch, not the whole copy.
  • Data validation is a deliverable, not an afterthought.
  • Reverse replication or a tested restore path is what makes rollback real.
  • Databases move last in a wave, once the applications that use them are proven.

Why databases are the hard part

Application servers are mostly replaceable. Databases hold state, and state cannot be rebuilt from a pipeline. A database migration has to preserve every committed transaction, keep performance acceptable on the new platform, and give the business a way back if something is wrong. It also tends to be the longest-running piece of any wave, because the data has to be copied while the source keeps changing.

This is why databases are scheduled last within each wave of our migration roadmap, after the servers that use them are proven. The wider programme is described on the cloud migration service page.

What good looks like

  • The source is fully understood: version, size, extensions, jobs, users, linked servers and peak write rates.
  • The target is chosen for a reason, not by default.
  • Replication runs for long enough to prove it keeps up, before the cutover date.
  • Validation is automated and repeatable.
  • The cutover has been rehearsed with a stopwatch, and the rollback has been rehearsed too.

Same engine or a different one

A migration from one version of an engine to the same engine on a managed service is mostly about data movement and parameters. A migration across engines, such as a commercial database to PostgreSQL, is a conversion project. Data types differ, stored procedures use different languages, and subtle behaviours such as how nulls, case and dates are handled can change results.

For cross-engine work, the AWS Schema Conversion Tool or the equivalent in the Azure tooling produces a first pass and an assessment of what it could not convert. The remaining work is manual and needs application tests, so the timeline should reflect that. We are candid when the business case for changing engine does not hold up. A same-engine move onto a managed service often delivers most of the operational benefit with much less risk, which is the replatform route in the 6Rs.

How continuous replication works

DMS runs in three phases. A full load copies existing data. Change data capture then reads the source’s transaction log and applies changes to the target, so the target catches up and stays current. At cutover you stop writes, let the remaining changes drain, and switch.

The source must be prepared for this. For PostgreSQL, logical decoding needs the right settings:

-- Source PostgreSQL: prerequisites for logical replication based CDC
-- (set in parameter group or postgresql.conf, then restart)
--   wal_level = logical
--   max_replication_slots >= number of tasks
--   max_wal_senders >= number of tasks

-- Create a dedicated replication user
CREATE ROLE dms_user WITH LOGIN REPLICATION PASSWORD :'dms_password';
GRANT SELECT ON ALL TABLES IN SCHEMA public TO dms_user;

Supply the password from a secrets manager at run time rather than typing it in a script. Also monitor replication slots: an abandoned slot makes the source retain write-ahead log and can fill its disk. That is a classic way for a migration to cause a production incident on the old system.

SQL Server and Oracle sources have their own prerequisites, such as supplemental logging or an appropriate recovery model. We check these during assessment, because some require a restart or a change window.

Validating the result

We validate at three levels. First, counts and checksums per table, using DMS validation where it supports the engine and independent queries where it does not. Second, schema parity: indexes, constraints, sequences and permissions. Sequences and identity values are a frequent miss, since a target that restarts at a low value causes duplicate key errors after cutover. Third, application behaviour: run the real test suite and, where possible, replay representative read traffic and compare responses and timings.

Performance deserves its own look. A query plan that was fast on the old engine can be slow on the new one, particularly after a cross-engine move. We capture slow queries from the source beforehand and compare.

Decisions and trade-offs

Managed service or self-managed. A managed database such as RDS, Aurora or Azure SQL removes patching and backup toil. It also removes some low-level control, and some extensions or settings may not be available. Check the features you rely on before committing.

DMS or native. Backup and restore is the simplest and most reliable method when a longer outage is acceptable. Replication is needed when it is not. Use the simplest method that meets the downtime requirement.

When not to migrate a database. A database with tight coupling to on-premises hardware, or a licence that makes a managed target uneconomic, may be better retained for now with applications moving around it, subject to the network path being suitable.

A worked example: sizing the cutover window

Suppose a rehearsal shows that stopping writes, draining replication and repointing the application takes a measurable number of minutes, and that the post-cutover checks take a further stretch. The announced window is then the sum of those timings plus a safety margin, not an optimistic guess. We also agree a point of no return in advance: if validation has not passed by that time, the team rolls back rather than debating it under pressure.

Common failure modes

  • Replication lag at cutover that nobody measured under peak load.
  • Large objects and unsupported types that migrate incorrectly or not at all.
  • Missing sequence resets, leading to key collisions immediately after the switch.
  • Forgotten dependants: reports, ETL jobs and linked servers still pointing at the old host. The dependency mapping catches most of these.
  • Disk exhaustion on the source from retained log.
  • No rollback data path, so going back means losing the writes made since cutover.

Delivery and handover

You get the migration runbook, the validation scripts and their results, the rehearsal timings and the parameter settings used on the target. Backups and recovery for the new database are configured and tested as part of handover, in line with our backup and disaster recovery practice. The final switch is coordinated with the DNS cutover plan.

How to tell it is working

Replication lag stays near zero under normal load. Validation reports show no unexplained differences. The rehearsal window matches the announced window. After cutover, error rates and query latencies sit within agreed bounds, and the old database is retained read-only for an agreed period before being retired. To scope a database migration, book a consultation.

References

How we deliver it

  1. 01

    Assess the source

    We inventory engines, versions, sizes, features, extensions, jobs and who connects, and check licence and compatibility constraints.

  2. 02

    Choose target and method

    Managed service or self-managed, same engine or change, and native tools or DMS, based on risk and downtime tolerance.

  3. 03

    Convert schema and code

    For cross-engine moves, schema, procedures and queries are converted, reviewed by hand and tested.

  4. 04

    Full load and replication

    The initial copy runs, then change data capture keeps the target current while teams test.

  5. 05

    Validate and rehearse

    Row counts, checksums and application tests run against the target, with at least one full cutover rehearsal.

  6. 06

    Cut over and keep a way back

    Writes stop, replication drains, applications switch, and reverse replication or a restore path stays ready until stability is proven.

Tools and technologies

AWS Database Migration ServiceAWS Schema Conversion ToolAzure Database Migration ServiceAzure Data StudioAmazon RDSAmazon AuroraAzure SQLpg_dumppglogicalSQL Server log shippingpt-table-checksum

Frequently asked questions

Can you migrate a database with zero downtime?
Close to it, not literally. Change data capture keeps the target in sync, so the only outage is the final switch: stopping writes, letting replication drain and repointing applications. Depending on the system that can be minutes. We rehearse so the real window is known, not guessed.
What is the difference between homogeneous and heterogeneous migration?
Homogeneous means the same engine, for example PostgreSQL to PostgreSQL, which is mostly data movement. Heterogeneous changes engine, for example Oracle to PostgreSQL, and also needs schema, procedure and query conversion plus application testing. The second is a larger and riskier project.
Should we use DMS or native replication?
Native tools such as logical replication or backup and restore are often simpler and more faithful within the same engine. DMS is useful for cross-engine moves, mixed sources and continuous replication with little setup. We pick per database, and sometimes use both.
How do you check the data arrived correctly?
We compare row counts, run checksums on key tables and use the validation features in DMS where available. Then application level tests exercise real queries. Counts alone can hide subtle differences such as truncation or encoding changes, so we check data types and sample content too.
What if the cutover fails?
We rehearse the rollback. Depending on the design, that means pointing applications back at the source, which is only safe if the source has stayed current via reverse replication or if no writes occurred. The decision criteria are agreed in advance and recorded in the roadmap.

Talk to an engineer about database migration aws dms

Book a free 30-minute call. We review your current setup and tell you honestly whether and how we can help.

Written by Saddique Khan, DevOps / SRE / Cloud Consultant Engineer. Last updated 2026-10-08.